6325.3 Advertisement for Bids-Sewer & Water Line / COMM. 6245
ADVERTISEMENT FOR BIDS
CAPITAL FUND PROGRAM SC 17-501-24
Sewer & Water Line / COMM. 6245
GAFFNEY HOUSING AUTHORITY
GAFFNEY, SOUTH CAROLINA
Sealed proposals will be received by the GAFFNEY HOUSING AUTHORITY for SC 17-501-24 until 4:00 PM, WEDNESDAY, APRIL 15, 2026, and immediately thereafter publicly opened and read for the furnishing of labor, material, and equipment entering into the Modernization of Project SC 17-1. The scope of work will consist of repairs and modernization of the existing project and include the following items:
- Replace existing sanitary sewer main pipe and manholes; replace collector piping and provide new cleanouts; replace existing cleanouts at each apartment; replace water service branch piping, water valves, and valve boxes.
- All other work is shown on plans, in the specifications, and as required by codes.
A Pre-Bid Conference has been scheduled for 2:00 P.M., WEDNESDAY, APRIL 1, 2026. The meeting will be held at the Gaffney Housing Authority Administration Office, located at 125 Beltline Road, Gaffney, SC 29341. A site visit will follow the meeting.
Contractors may access the site at any time, but are asked to notify the Owner / schedule their visits ahead of time. Contractors shall contact Adrian Jones, Maintenance Director, at (864) 492-5791.
Questions that arise from the Site Visits are to be directed to the Architect at bids@stognerarchitecture.com.
Complete Plans and Project Manual will be available for online viewing from the offices of Construct Connect www.constructconnect.com; Dodge Data & Analytics http://dodgeprojects.construction.com; The Blue Book www.thebluebook.com; and Construction Journal www.constructionjournal.com
Complete Plans and Project Manual may be obtained by download from Stogner Architecture, PA. by qualified bidders. For instructions on downloading these documents, email bids@stognerarchitecture.com.
Documents may be obtained in printed form from Duncan Parnell, 900 S. McDowell St, Charlotte, NC 28204, cad1@duncan-parnell.com, (704) 372-7766, with production costs being paid by the contractor.
All contractors are hereby notified that they must have a proper license under the State laws governing their respective trades, whether or not Federal Funding is involved.
Contractors will be responsible for ensuring that economic opportunities, to the greatest extent feasible, follow Section 3 Requirements 24 CFR Part 135.1 and Section 3 Clause 24 CFR Part 135.38.
The Owner reserves the right to reject any or all bids and to waive informalities.
TIFFANY ASKEW, EXECUTIVE DIRECTOR
GAFFNEY HOUSING AUTHORITY
Designer: Stogner Architecture, PA
615 East Broad Avenue
Rockingham, North Carolina 28379